Bathroom tiling
Full bathroom tiling, from strip-out and waterproofing to the last line of grout, planned so the cuts fall where you won't notice them.

What we do
- Strip-out of old tiles.
- Waterproofing of the wet areas.
- Wall and floor tiling, niches and hobless showers.
- Grout, silicone and a final clean.
Planning the layout
- Where the full tiles and cuts will sit.
- Lining up with the vanity, niche and window.
- Falls to the drain in the shower.
- Trims and edges.
A bathroom, step by step
What happens, in order.
Plan the layout
Tile sizes, set-out lines and where the cuts fall, agreed before we start.
Strip-out
Old tiles removed and the room prepared, with dust kept in.
Waterproofing
Applied to wet areas and left to cure before tiling.
Tiling
Walls and floor laid level, with even grout lines and neat cuts.
Grout and seal
Grout, silicone to the joints that move, and a clean finish.
Handover
A walk-through, care notes for your grout, and the room left clean.
Questions
Bathroom tiling FAQs
How long does a bathroom take?
It depends on the size of the room and drying times for waterproofing. We give you a realistic plan in your quote.
Do you supply the tiles?
We can, or you can choose your own. We'll tell you how much to order.
Do you remove old tiles?
Yes, and we take them away.
Can you tile over existing tiles?
Sometimes, if the old tiles are sound and the heights work. Often removing them is the better choice. We'll check.
Get a tiling quote
Tell us about the room. Photos and rough measurements help us quote faster.